
OUR PROJECTS
Here is a list of recent projects that our Management team has worked on.

01
RE-DEVELOPMENT
A 100+ year old field that had 99.5% water cut was redeveloped with enhanced recovery methods (Steamflood and Waterflood) to push recovery past 100 Million barrels!
02
STEAMFLOOD
Two steamflood projects but both extremely unique and versatile. First project is an Engineering marvel; steam injection in a highly permeable reservoir with high water drive. Second project is one of the shallowest steamflood in the world!


03
WATERFLOOD
A typical inverted 5-spot pattern waterflood had to be re-imagined when horizontal producers were drilled that intercepted the patterns. Read more to find out what the challenges were and how they were resolved.
04
200+ HORIZONTAL WELLS
Major oil company overlooked a low permeability zone when field was first discovered. The advent of horizontal well technology and sound understanding of the reservoir resulted in a 200+ horizontal well drilling program.
